Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.


Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.

PrimeTrack

Danger – Scaffold Incomplete, Do Not Use

PT-058

Danger – Scaffold Incomplete, Do Not Use

Danger – Scaffold Incomplete, Do Not Use is a danger tag from Prime Tags, supplied ready to use with this wording pre-printed on durable, weather-resistant material.

What this tag is for

This tag warns that a scaffold is incomplete and must not be used until it's been finished and formally handed over. It's a critical safety control during scaffold erection or dismantling, when a structure may look usable but hasn't been certified. Scaffold must be inspected and formally handed over before use under Australian WHS requirements, and this tag is a simple way to flag that it isn't ready yet.

Key features

  • Fixed, pre-printed wording: The message is clear and consistent every time the tag is used, with no risk of it being written out incorrectly on site.
  • Front-printed message: The instruction sits clearly on the face of the tag for quick recognition at the point of use.
  • Built for Australian conditions: Made from tough, UV-stable and weather-resistant material that won't fade, tear or fail outdoors.
  • Fast turnaround, Australia-wide: Prime Tags ships nationally with quick dispatch so you're not waiting on stock tags.

Where this tag is used

  • Scaffold erection and dismantling
  • Scaffold inspection and handover
  • Construction site access control

Custom tag options

If your site or fleet needs this message on a different tag format, size or material, Prime Tags can set that up as a custom order. The team can also combine it with your branding or other tags used across your operation.

Request a Quote

Search