Phone: 03 7064 0578 | sales @primetags.com.au
1/12 Sette Cct, Pakenham VIC 3810, Australia
Gain total control over complex joint integrity workflows with our 4-Stage Fitting Check Flange Tags. Designed for projects requiring an additional layer of verification, this system enforces a strict 4-step sequence—typically Inspect, Assemble, Torque, and Test—to ensure no safety milestone is skipped.
By physically separating the "Torque" and "Test/Commission" stages, these tags provide a critical safeguard for high-pressure systems. They create a highly visible, tamper-proof audit trail that prevents the accidental pressurisation of joints that have been torqued but not yet hydro-tested or approved by Quality Assurance.