Phone: 03 7064 0578 | sales @primetags.com.au
1/12 Sette Cct, Pakenham VIC 3810, Australia
Achieve total visibility over your joint integrity process with our 5-Stage Fitting Check Flange Tags. Engineered for high-pressure systems and critical shutdown environments, this comprehensive flange management system extends beyond simple assembly checks to cover the entire lifecycle of a disturbed joint - from initial containment break to final hydro-testing and handover.
This 5-part sequential system creates a non-negotiable, physical audit trail at the point of work. By requiring distinct sign-offs for disassembly, inspection, re-assembly, torquing, and testing, it eliminates the "blind spots" in complex piping operations. It ensures that no joint is pressurised until every safety milestone has been physically verified and torn off, preventing leaks, rework, and catastrophic containment failures.