Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.


Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.

PrimeTrack

Commissioning in Progress

PT-073

Commissioning in Progress

Commissioning in Progress is a barricade and access control tag from Prime Tags, supplied ready to use with this wording pre-printed on durable, weather-resistant material.

What this tag is for

This tag flags equipment or a system as currently being commissioned, warning workers that it may be partially operational, under test, or not yet cleared for normal use. It helps prevent equipment being treated as fully operational before commissioning is complete.

Key features

  • Fixed, pre-printed wording: The message is clear and consistent every time the tag is used, with no risk of it being written out incorrectly on site.
  • Front-printed message: The instruction sits clearly on the face of the tag for quick recognition at the point of use.
  • Built for Australian conditions: Made from tough, UV-stable and weather-resistant material that won't fade, tear or fail outdoors.
  • Fast turnaround, Australia-wide: Prime Tags ships nationally with quick dispatch so you're not waiting on stock tags.

Where this tag is used

  • Plant and equipment commissioning
  • New installation testing
  • Project handover control

Custom tag options

Prime Tags can also produce this wording in a custom layout, colour or material if it needs to match an existing tag system or a specific hire fleet's branding. Talk to the team about combining it with other pre-printed or fully custom tags for your site.

Request a Quote

Search