Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.


Introducing Prime Track

Track Your Assets →Know Where They Are → Know Who’s Responsible.

PrimeTrack

Material Reserved for Shutdown

PT-030

Material Reserved for Shutdown

Material Reserved for Shutdown is a worksite safety and process tag from Prime Tags, supplied ready to use with this wording pre-printed on durable, weather-resistant material.

What this tag is for

This tag marks materials or spare parts that are set aside for a planned shutdown or turnaround, so they aren't accidentally used, moved or issued for other jobs. It helps shutdown planners keep critical stock ready for when the work window opens.

Key features

  • Fixed, pre-printed wording: The message is clear and consistent every time the tag is used, with no risk of it being written out incorrectly on site.
  • Front-printed message: The instruction sits clearly on the face of the tag for quick recognition at the point of use.
  • Built for Australian conditions: Made from tough, UV-stable and weather-resistant material that won't fade, tear or fail outdoors.
  • Fast turnaround, Australia-wide: Prime Tags ships nationally with quick dispatch so you're not waiting on stock tags.

Where this tag is used

  • Shutdown and turnaround planning
  • Plant maintenance stores
  • Spare parts management

Custom tag options

If your site or fleet needs this message on a different tag format, size or material, Prime Tags can set that up as a custom order. The team can also combine it with your branding or other tags used across your operation.

Request a Quote

Search